11 DECEMBER 2017

Published : 15 Ene , 2017

We started the transpor of 63-meter long blades from the Siemens Gamesa Factory in the TAC to the port of Tangier Med, a long-term contract for which Lasarte Maroc has acquired the specific transport equipment.

Previous :